Exam Question
Cycle time as used in assembly line manufacturing is:
- 1. the time taken in last work station
- 2. the productive time divided by demand
- 3. the time taken by the bottleneck operation
- 4. both b) and c) are considered and the higher value taken
View Answer
Answer 2. the productive time divided by demand